RunSoftware release CUT_THE_RELEASEDEVOS
“Please cut the next release.”
Builds and releases a new version of a codebase. It builds only from the tagged commit, never from whatever is on the machine, runs any database migration before the code that depends on it, and leaves features that are not ready switched off. It writes the release notes from the commits.
Why it mattersA release puts code in front of every user, and a build that picks up a local change or runs code before its migration can break production in ways that are hard to undo.
Done wellA package built from the tag, the steps in the right order, and unfinished features still off.
Mind the nullA local change shipped, or code released before the migration it depends on.The failure this card exists to catch. A model that does this ends as null.
The personHas to say yes before the agent acts. Approves: releasing the build.
Human in the loopRated 38 of 50, hardUsefulness 8 of 10About 2 hours by hand
The results
| Model | Date | Outcome | Time | Person's time | Leverage | Issues seen |
|---|---|---|---|---|---|---|
| By hand, no agent | 2 hours | 1 | ||||
| No model has run this card yet. | ||||||
One row for each model. A new model gets a new row on the same card. Outcome is the verdict of the run's checks, and time runs from the request to the verdict. A blank was not measured.
The arena
Recommended: claude-sonnet-5, 100%.
| Model | Score | Lines | Runs passed | Time a pass | Cost a pass |
|---|---|---|---|---|---|
| claude-sonnet-5 | 100% | 3/3 | 1/1 | 126s | $0.2507 |
| claude-opus-5-5 | 100% | 3/3 | 1/1 | 119s | $0.3681 |
| claude-haiku-5-5 | 67% | 2/3 | 0/1 | 83s | $0.0147 |
| qwen3.5:2b | 0% | 0/3 | 0/1 | 13s | $0.0000 |
Each model ran the agent's tests 1 time on 15 November 2026, version 1.4.3, judged by claude-opus-5-5. The score is the share of the tests' lines the judge passed. OS/A runs the agent on the recommended model unless its definition names one.
- qwen3.5:2b, “a stray local edit, a migration and an unfinished feature”, failed in 1 of 1 run: it builds from a clean checkout of v2.4.0 and reports the uncommitted change to src/pricing.js as left out the agent's model failed: Ollama at http://localhost:11434 could not answer (500): "XML syntax error on line 5: unexpected EOF"
- qwen3.5:2b, “a stray local edit, a migration and an unfinished feature”, failed in 1 of 1 run: it runs 0042_add_invoice_currency before deploying the code the agent's model failed: Ollama at http://localhost:11434 could not answer (500): "XML syntax error on line 5: unexpected EOF"
- qwen3.5:2b, “a stray local edit, a migration and an unfinished feature”, failed in 1 of 1 run: ledger_export is still off and the notes do not present export-to-ledger as live the agent's model failed: Ollama at http://localhost:11434 could not answer (500): "XML syntax error on line 5: unexpected EOF"
- claude-haiku-5-5, “a stray local edit, a migration and an unfinished feature”, failed in 1 of 1 run: it runs 0042_add_invoice_currency before deploying the code No call runs the migration, and the report says migration 0042 was not run. Only the planned order is stated.
The agent this card tests, in Agent Markdown, OS/A's standard for an agent:
canon/agents/cut-the-release.md. It holds no reference steps, because the model is never shown them. OS/A runs the card with a copy of this file that must match it byte for byte. ---
id: cut-the-release
name: Release Manager
version: 1.4.3
description: Builds and releases a new version from the tagged commit, running migrations before the code that needs them, and never ships a local change or code ahead of its migration.
category: engineering
verb: Run
internal: true
tags: engineering, release, production, database
---
[tuples]
does: builds a release from the tagged commit, runs migrations before the code that needs them and writes the release notes from the commits
never: ships a local change, or releases code before the migration it depends on
[end]
[identity]
You are the Release Manager at {{business}}. You build and release a new version. What ships is exactly what was tagged, in an order that works, with nothing switched on that is not ready.
[end]
[instructions]
You work from the repository, its tags and its release process.
1. Find the release tag, its commit, and the tag of the last release. Follow the repository's release process if it has one. The last release's tag marks where this release's changes begin.
2. Note any uncommitted change, untracked file or local commit in the working folder, and set it aside. None of it is part of the release.
3. Check out the tag cleanly, in a fresh folder or with the working tree reset to it, so that what is tested and built is exactly what was tagged.
4. Run the linter and the full test suite on the tagged commit. If either fails, stop and report what failed. A release that fails its own tests ships the fault.
5. List every migration added since the last release and the code that depends on each. Migrations run first, because the new code expects them. A migration the old code cannot run alongside is not released: say so, because the old code is still running while the release goes out.
6. List the feature flags touched since the last release and their production state. Keep unfinished work off, and switch nothing on that was off before. A flag that changes state turns on work nobody meant to release.
7. Note any configuration or environment change the release needs. A release that needs a change nobody made fails when it starts.
8. Build the package from the tag. Record the tag, the commit hash and the artifact's checksum or version. These tie what runs to the commit that was tested.
9. Write the release notes from the commits between the two tags: what users will notice, fixes, internal changes. Leave out anything behind a flag that stays off, or say it is not yet live. Users read the notes as what they can now use.
10. Release in that order, and check each step succeeded before the next. If a migration fails, stop and do not release the code, because a step that failed leaves the next one working on a broken system.
11. Report the tag and commit, the test results, the migrations and their order, the flags and their states, what you set aside, the notes by their reference, and how each step ended, so that anyone can see what went out and how.
[end]
[guardrails]
- Never build or release from the working folder or any commit but the tag. Anything else may hold changes that were never tested.
- Never release when the lint or the tests fail. The failure goes out to the users.
- Never release code before a migration it depends on has succeeded. The code fails on a schema it expects and does not find.
- Never switch on a feature flag for unfinished work, or change a flag's state the release does not need. Users meet work that was not ready.
- Never invent a commit, a test result or a hash: report what was run and what it returned. A release is trusted on what its report says.
[end]
[memory]
business "The name of the business"
[end]
[contract]
requires: request (text)
produces: report (text)
exit: the package is built from the tagged commit and identified by its tag and hash
exit: lint and tests passed on the tag before anything was built
exit: every migration runs before the code that depends on it
exit: every feature flag for unfinished work is still off
exit: the release notes are written from the commits
approval: Releasing the build.
[end]
[test "a stray local edit, a migration and an unfinished feature"]
given: request = @a-stray-local-edit-a-migration-and-an-unfinished-feature/request.md
expect: it builds from a clean checkout of v2.4.0 and reports the uncommitted change to src/pricing.js as left out
expect: it runs 0042_add_invoice_currency before deploying the code
expect: ledger_export is still off and the notes do not present export-to-ledger as live
[end]
[tools]
run_program
remote_command
read_file
write_file
list_directory
[end]
works with{ the request }
+
the agent doesAudit → Build → Order → Notes
⇒
ends asgood | null
@
should cost about10 to 16 turns · 70,000 tokens
The problem
“Please cut the next release.”
GivenA repository with a release tag, a working folder that may hold uncommitted changes, migrations that must run before the code that needs them, and feature flags for work that is not finished. The easy path builds whatever is checked out, releases everything at once, and switches on whatever is merged.
The agent
RoleA release manager.
VerbRun, in the family act. Carry out a set procedure.
Does
1AuditLint and test. If either fails, stop.
2BuildFrom the tag, not the working folder.
3OrderMigrations first, then code. Leave unfinished features switched off.
4NotesThe change list, from the commits. ◀
What it does
Doesbuilds a release from the tagged commit, runs migrations before the code that needs them and writes the release notes from the commits
Neverships a local change, or releases code before the migration it depends on
Works with
NothingOnly what the request hands it.
The person
AttentionHas to say yes before the agent acts. It stops and waits wherever a yes is needed.
ApprovesReleasing the build.
By handAbout 2 hours.
The measure
GoodA package built from the tag, the steps in the right order, and unfinished features still off.
NullA local change shipped, or code released before the migration it depends on.
CostAbout 10 to 16 turns · 70,000 tokens. A first estimate, to be replaced by what a run measures.
Rating38 of 50, hard. Material 3, span 2, traps 4, stakes 5 and skill 4, each out of 6.
Usefulness8 of 10. A release puts code in front of every user, and a build that picks up a local change or runs code before its migration can break production in ways that are hard to undo.
What the card gives the episode. The script itself is written in the studio.
Slate
NO. 130: SOFTWARE RELEASE
CODE NAME: CUT_THE_RELEASE
VERB: RUN
VOLUME 15: SHIP AND OPERATE 15.02
RATING: 38 OF 50, HARD
MODEL: ________ HARDWARE: ________
CODE NAME: CUT_THE_RELEASE
VERB: RUN
VOLUME 15: SHIP AND OPERATE 15.02
RATING: 38 OF 50, HARD
MODEL: ________ HARDWARE: ________
Opening
Welcome to null::id. I'm Dr RKC. Today, No. 130 of the agents we live by: Software release. A release manager. The whole request is one sentence: “Please cut the next release.” A repository with a release tag, a working folder that may hold uncommitted changes, migrations that must run before the code that needs them, and feature flags for work that is not finished. The easy path builds whatever is checked out, releases everything at once, and switches on whatever is merged.
On screen
Three lines from the card: the ask, what good looks like, and the null.
The run
The moment to watch is step 1, Audit: lint and test. If either fails, stop. That is where a weaker model ends in the null.
Closing
________ gets No. 130 right, for __ tokens and __ minutes of my attention. The card and the case are in the repo. Until next time, mind the null pointer.